CTliveCTlive
    CTliveCTlive
    Audio Articoli
    • Home
    • VisitCavallino
    • Magazine
      • 2025
        • CTlive 01 – 2025
        • CTlive 02 – 2025
        • CTlive 03 – 2025
        • CTlive 04 – 2025
      • 2024
        • CTlive 01 – 2024
        • CTlive 02 – 2024
        • CTlive 03 – 2024
        • CTlive 04 – 2024
      • 2023
        • CTlive 01 – 2023
        • CTlive 02 – 2023
        • CTlive 03 – 2023
        • CTlive 04 – 2023
    • Articoli
      • Editoriale
      • A tavola
      • Anahata Yoga
      • Animali in forma
      • Attualità
      • Cavallino-Treporti
      • Circondati di natura
      • Cultura
      • Eventi
      • I percorsi ciclabili
      • La rana che ride
      • Mercato
      • Spazio Verde
      • Spazio Wine
      • Veneto
      • Venezia
      • Vivi il litorale
    • Deutsch
      • Leitartikel
      • Audiobeiträge
      • Wirklichkeit
      • Anahata Yoga
      • Haustiere
      • Cavallino-Treporti
      • Natur
      • Die Radwege
      • Erlebe das Litoral
      • Essen
      • Kultur
      • Spazio Verde
      • Spazio Wine
      • Venedig
      • Veneto
      • Veranstaltungen
    • English
      • Editorial
      • Audio Posts
      • Actuality
      • Anahata Yoga
      • Pets
      • Bicycle paths
      • Cavallino-Treporti
      • Nature
      • Culture
      • Enjoy the coast
      • Events
      • Food
      • Spazio Verde
      • Spazio Wine
      • Veneto
      • Venice
    CTliveCTlive
    Home»English»Actuality»Cycle paths, looking to the future
    Actuality

    Cycle paths, looking to the future

    CTliveBy CTlive28/08/2025

    Work begins on new bicycle paths

    The “Nuova Via delle Batterie” project, worth €7.2 million, will begin in autumn with the widening of the carriageway, a 3.5-kilometre cycle path, new parking spaces, access to the sea, redeveloped green areas, improved lighting, underground services and a roundabout to regulate traffic. At the same time, in Punta Sabbioni, Via Hermada and Via Montello are to be upgraded at a cost of €2.9 million, in a public-private partnership with Camping Marina di Venezia. The project includes making the roads safer, a cycle and pedestrian path, a mini roundabout in Via Adige, a waiting area for vehicles heading to the campsite and the widening of Via Montello with a bike lane. Both projects aim to improve traffic flow, safety and liveability. Also in Punta Sabbioni, the section of the Trieste-Venice cycle path developed on the east side of Via Lungomare San Felice has been opened to traffic, running alongside Forte Vecchio, passing through Via Forte Vecchio, and continuing to Via Fausta.

    Share. Facebook Twitter LinkedIn WhatsApp Telegram
    Previous ArticleDER URLAUB DES LÄCHELNS
    Next Article THE HOLIDAY OF SMILES

    Articoli Correlati

    Audio Posts

    THE HOLIDAY OF SMILES

    By CTlive28/08/2025
    Actuality

    THE TERRITORY THROUGH THE LAGOON RUN

    By CTlive28/08/2025
    Da non perdere
    Audio Articoli

    Il birdwatching e lo spettacolo da natura

    By CTlive15/05/2023

    Sono diversi i punti del territorio di Cavallino Treporti dove praticare il birdwatching, per scoprire…

    Destinazione: Cavallino-Treporti

    15/05/2023

    La spiaggia

    15/05/2023

    Circondati dalla laguna

    15/05/2023

    Le aree verdi

    12/05/2023
    EDITORE E PROPRIETARIO

    NEXTITALIA
    Jesolo (VE)

    Contatti

    tel. 0421 971896
    info@nextitalia.it

    CTlive - © NEXTITALIA SRL - VIA AQUILEIA, 62 - 30016 - JESOLO, ITALIA
    0421 971896 - 348 3311279 - INFO@NEXTITALIA.IT
    C.F./P.IVA/REG.IMP. VENEZIA ROVIGO DELTA LAGUNARE 04481000273
    Design by Media Wave

    Type above and press Enter to search. Press Esc to cancel.